4 Year Revitalization Plan
Background
The new Woodstream Falls Board of Directors was installed in September 2006. Since that time,
we have spent countless hours carefully reviewing the needs of the Woodstream Falls Community. We have also spent a considerable
amount of time reviewing the contractual agreements, financial status, and capital improvement plans developed and given to
us by the previous management company and Board of Directors.
Based
on that review, the following 4-year plan has been developed to revitalize Woodstream Falls.
Goals of “The Plan”
1) To increase homeowner value
2) To
reduce HOA fees within 4 years
3)
To increase owner occupancy
4) To improve the overall appearance of the
community
5)
To improve the operational efficiency of the community
6) To begin work immediately
on needed infrastructure improvements without a special assessment
7) To develop a sound financial
plan for the future
8) To
improve the energy efficiency of the community
First Steps
Our first action as your new board was to rescind the very large special assessment imposed by the
previous Board of Directors and Management Company.
While the board believes that the elimination of the “special assessment” was
a great first step for our homeowners, we also understand that the infrastructure repairs it was supposed to pay for are still
facing us. We understand those infrastructure repair needs to be as follows:
1) Roof replacement
2)
Repair & replacement of 2nd floor entrance stairways
3) Heating
and cooling system improvements to increase performance, reliability and efficiency
4) Repair & replacement of
patio and balcony enclosures
5)
Repair & replacement of walkways, steps, bridges and landscaping
6) General building maintenance
and painting

New Roofs - Phase 1 - Completed July-2008
Overview of “The Plan”
To avoid creating a financial hardship
for the association, and the need for immediate large homeowner special assessments, the Board of Directors believes it is
best to address these issues over the next 4 years in stages with a “pay as you go” approach. While this approach
will mean the some issues will not be addressed as quickly as we might like, it will allow us to prioritize those improvements
that are most critical to the community and begin working on them this year.
This “pay as you go” approach also means that our association fees will not be
reduced anytime in the near future. As fellow homeowners, the board shares the community’s interest in lowering association
fees; however, an immediate lowering of fees will not allow us to proceed with these improvements in a timely manner. In November,
the board voted to keep homeowner association fees at current levels for 2007. Based on current infrastructure needs and occupancy
projections, we do not anticipate any change for 2008. We will continue to make every attempt to improve operating efficiency
so that more money can be devoted to completing the larger projects needed to keep our community moving forward. We will do
this by continuing to evaluate all service contracts, reduce cost, and eliminate waste without compromising service to the
community wherever possible.
Our ability
as a community to implement this plan is based on certain specific assumptions and projections regarding occupancy, the collection
of HOA fees, and our understanding of the community’s infrastructure needs as they exist today. Should these projections
change, or unforeseen expenses arise, the board will revise this plan as needed to keep Woodstream Falls moving forward.
This may include the need for extending the timeframe for
completion of certain projects and or seeking other means of financing these improvements. In any case, the board will make
every effort to achieve these goals without the need for large special assessments whenever possible.
Assumptions of “The Plan”
1) We will increase active unit
ownership to 90 % within the next 18 months.
2) We will make improvements to the current heating and cooling
system that will reduce the utility and repair costs associated with it and prolong its useful life for
at least for 4 years.
3)
We will reduce overall community operation and maintenance costs by 5 % per year over the next
4 years to pay for repairs.
4)
We will increase energy efficiency through community cooperation and education programs
5) We
don’t experience any unusual costly community maintenance or operational expenses for the next 4 years
The Plan Timeline
Stage 1 - May 1, 2007 – April
30, 2008
Capital Improvement projects
1) Begin replacement
of selectedl roofs & rooftop decks
2) Repair/replace patio and balcony
enclosures
3)
Upgrade the existing heating and cooling system to extend its life, and improve its reliability
and performance.

New Boilers Activated Fall 2007
4) Repair/replace/remove
walkways and steps, & bridges in common areas
5) Repair/replace 2nd floor
entrance stairways
6)
Repair/resurface/remove selected structures with peeling paint and deteriorating
wood construction (carports & overhead building connectors, & laundry rooms)
7) Obtain a new engineering analysis
to determine the best long term heating,
cooling, insulation, and electrical solution
for the community from the University
Other Projects
1) Begin
homeowner/tenant energy conservation and education program.
2) Address illegal/improper parking space
usage.
3)
Increase communication efforts with owners, real estate community, and other governmental agencies
to improve the public perception of Woodstream Falls.
4) Reduce receivables
The implementation of each of these initiatives will be prioritized
based its impact on homeowner safety, community appearance, and its long-term impact on the community’s financial position.
Stage 2 May 1, 2008
– April 30, 2009
Capital Improvement projects
1) Adopt a new heating/cooling/ insulation/ and electrical plan for the community
2) Begin
the 1st phase of implementing the new heating/cooling/insulation and electrical plan. (Proof of Concept)
3) Repair/resurface exterior of clubhouse
4) Develop and obtain bids on new landscaping
plan.
Continue work on items 1-6 above started in stage 1
1) Replace
selected roofs & roof top decks
2) Repair/replace patio and balcony enclosures
3) Upgrade the existing heating and cooling system to extend its life, and improve its reliability and performance.
4) Repair/replace walkways and steps in common areas

New stair Treads Started Fall 2008
5)
Repair/replace 2nd floor entrance stairways
6) Repair/resurface
selected structures with peeling paint
Other Projects
1) Continue homeowner/tenant energy conservation and education
program.
2)
Step up communication efforts with owners, real estate community, and other governmental agencies
to improve the public perception of Woodstream Falls.
3) Develop new policy for posting signs in
community
4) Repair/
replace building designation letters
Stage 3 May 1, 2009 – April 30, 2010
Capital Improvement Projects
1) Begin
2nd phase of community wide roll out of the new heating, cooling, insulation, and electrical improvements
2) Begin
implementation of new landscaping plan.
3) Repair/replace 2nd and 3rd floor landings and
stairways
4)
Evaluate progress on initiatives and develop the next three-year plan.
Other Projects
1) Continue homeowner/tenant energy conservation and education program.
2)
Step up communication efforts with owners, real estate community, and other governmental agencies
to improve the public perception of Woodstream Falls.
3) Begin sign improvements
Stage 4 May 1, 2010
– April 30, 2011
Capital Improvement Projects
1) Continue roll-out of community wide new
heating, cooling,
insulation and electrical improvements.
2) Adopt
a new three-year plan.